2004, commissioning two 1MVA Perkins gas-engined CHP generators and three LV switchboards in a tea garden in Bangladesh.
The recovered heat (from the engine jacket water, intercooler, and the exhaust) was used to preheat the air for the tea dryers.
The control system was plug-in relays, so any modifications involved rewiring the panel.
Both generators were successfully commissioned in six weeks.